FY 2007-08 Water Main Reinforcements (Various)
Engineering
Construction Cost: $1.8 million
Gaston Engineering provided surveying, engineering design, resident inspection and related services to BWWB for five water main segments totaling approximately 17,750 linear feet. The new mains, which vary from 6” to 18” diameter, will improve hydraulics as well as fire pressure in the northern reaches of BWWB’s service area.
